What is the Lua script task time, aka calculation raster?
Or does it not work that way?
Just trying to get some ideas how to make variable blinky shift lights as mentioned in this post:
http://www.autosportlabs.org/viewtopic.php?t=4078
Maybe the concept would be to use the setPwmPeriod( channel, period ) to define a fixed blink time period/frequency, and then use the setPwmDutyCycle( channel, dutyCyclePct ) with the dutyCyclePct varying by simple calculation according to the difference to the threshold.
Lua script task time/calculation raster?
Discussion on the Lua Scripting capabilities for RaceCapture/Pro. Also see the <a href="http://autosportlabs.net/RaceCapturePro_Lua_Scripting">Lua Scripting Guide</a>
Jump to
- Autosport Labs
- ↳ General Discussion
- ↳ News and Announcements
- ↳ New Project Suggestions
- CAN Devices
- ↳ ShiftX2
- ↳ AnalogX
- RaceCapture App
- ↳ RaceCapture App Operation and General Q&A
- ↳ RaceCapture App Bug Reporting / Feature Requests
- CAN bus and OBDII integration
- ↳ CAN mapping discussion
- ↳ OBDII PIDs discussion
- RaceCapture/Pro | RaceCapture/Apex | PodiumConnect
- ↳ RaceCapture/Pro introductions
- ↳ RaceCapture/Pro General Q&A
- ↳ Sensors
- ↳ Hardware and Installation
- ↳ Lua Scripting
- ↳ Telemetry
- ↳ Bug Reporting
- ↳ Feature Requests
- RaceCapture/Track
- ↳ RaceCapture/Track Introductions
- ↳ RaceCapture/Track Operation
- ↳ RaceCapture/Track Installation
- ↳ RaceCapture/Track Bug Reporting / Feature Requests
- Megajolt/E and Megajolt Lite Jr. (MJLJ)
- ↳ Ignition Map Library
- ↳ Powered by Megajolt Gallery
- ↳ Assembly
- ↳ Installation
- ↳ Operation
- ↳ Q&A
- ↳ Future Upgrades
- ↳ Bug Reporting
- ↳ Fixes/Patches/Updates
- ↳ Hard Rev Limiter